Victory Suites Gibraltar

Gibraltar Has More Tunnel Than Road: What Is Actually Inside The Rock

Last checked

About 55 km of tunnel runs through 6.7 square kilometres of limestone. Most of it is shut. Here is who cut it, what lived inside it, and the two galleries you can still walk in 2026.

There is more tunnel inside the Rock of Gibraltar than there is road on top of it. The Gibraltar Nature Reserve puts the network at about 34 miles, or 55 km, threaded through a territory of 6.7 square kilometres.

Almost all of it is shut. What you can walk is two galleries and a visitor centre, what you can drive is two road tunnels, and one of the most historically important chambers in the whole system is now a data centre with no public access at all.

This is the whole network: who cut it, when, what went inside, and which parts of it you can actually reach in 2026.

The comparison everyone repeats, and the part of it that does not hold

The line you will read is that Gibraltar has twice as much tunnel as road. Be careful with it. The tunnel figure is solid at roughly 55 km, but the road figure is not: published numbers run from about 29 km to 49.9 km of highway, and we could not find a current figure from the Gibraltar Government at all.

Take the low number and the tunnels are nearly double the roads. Take the high one and they are barely ahead. The claim that survives either way is the simple one: there is more tunnel than road. We are not going to assert the multiple, because the arithmetic depends entirely on which road figure you pick, and nobody who repeats the line says which they used.

The length by era is better documented, and the Ministry for Heritage's listing for the WWII tunnel complex is the primary source worth reading.

PeriodTunnel cutRunning total
1782 to 1799About 1,200 m in the Great Siege galleriesAbout 1.2 km
1800 to 1939Reservoirs, the Admiralty Tunnel, air raid sheltersAbout 7 miles, 11.26 km
1941 to 1943About 18 miles, 29 km, the wartime pushAbout 25 miles, 40 km
1944 to the early 1960sRoad tunnels and later worksAbout 34 miles, 54.7 km

Those figures add up, which is more than can be said for some of what circulates. One widely read travel page claims the Royal Engineers lengthened the tunnels by 33 miles during the Second World War. That is more than the entire network has ever measured, and the Ministry's own estimate for 1941 to 1943 is 18 miles.

It took 186 years and the hard part took five

Tunnelling started in 1782, when thirteen men of the Soldier Artificer Company cut into the North Face during the Great Siege. That story belongs to Sergeant Major Henry Ince and we have told it properly in the Cornish miner who tunnelled the Rock. By the end of that century they had managed about 1,200 m.

Then it mostly stopped for 140 years. Reservoirs went in between 1898 and 1915, the Admiralty Tunnel in 1898 and 1899, air raid shelters from 1936. By 1939 the total stood at about 7 miles.

What changed was Operation Felix, the German plan to take Gibraltar. The Ministry for Heritage records that preparatory work was already running before September 1940, when military tunnelling intensified under the Chief Engineer, Colonel C. E. Fordham. Phase I ran from about June 1940 to January 1942. Phase II, the largest excavation of the lot, ran to about March 1944.

The men who did it were not career soldiers. Recruits for the tunnelling companies were mostly former coal miners, and their officers came from the Institution of Mining and Metallurgy. Royal Engineer tunnelling companies 178, 180 and 170 worked alongside a General Construction Company and a Pioneer Company, about 900 men at full strength. In 1941 the 1st and 2nd Tunnelling Companies of the Royal Canadian Engineers arrived with roughly 300 more and modern diamond drilling equipment.

The rock they took out did not go to waste. Much of the spoil was tipped into the Bay of Gibraltar to extend the airfield, which reached 1,150 yards by April 1942, 1,550 yards by November 1942 and 1,800 yards by July 1943. The Ministry's listing also carries a figure for the volume removed, and we have left it out, because it does not reconcile with the tunnel lengths on the same page and we would rather drop a number than repeat one we cannot make add up. The runway you land on was dug out of the hill beside it, a point our runway crossing guide picks up.

Tunnelling finally stopped in April 1968.

The engineering rules, which are more interesting than the legend

The listing records the actual specifications, and they read like what they are: lessons learned the hard way. Chambers wider than 12 feet had to be arched, with a rise of one fifth of the span. Early flat roofed spans of up to 35 feet caused frequent rock falls, so they stopped building them.

Rock pillars of 20 to 30 feet were left standing between parallel chambers. Where one system sat above another, at least 100 feet of solid rock had to separate them. Communication tunnels ran up to 12 feet wide with 18 feet between the roof of the lower tunnel and the floor of the upper one.

Hay's Level gives the scale. Its main chamber is 16 m across, 10 m to the crown of the arch and 120 m long, dug in Phase I by 178 Tunnelling Company and wide enough for vehicles. It held a REME workshop and a Royal Army Ordnance Corps offloading depot, and it connects to Liddell's Union, a gallery named for Governor Sir Clive Gerard Liddell. Hay's Level itself is named for Lieutenant Colonel Robert Alistair Hay, Commander Royal Engineers in Gibraltar from 1940 to 1944.

A blast trap guarded the entrance, with a concrete plug since removed, designed so three ton vehicles could still get through. Excavation began at Willis's Elbow behind a reinforced concrete wall with a machine gun bunker screening the way in.

What was living in there

The phrase used for it is an underground city, and for once that is not marketing. The Nature Reserve says the complex could house the entire 16,000 strong garrison with food for 16 months. The Ministry for Heritage says the system was later expanded to hold up to 30,000 troops. Both numbers are in official sources and they are measuring different moments, so treat 16,000 as the garrison it sheltered and 30,000 as what it could take at full extension.

Inside were a hospital, a bakery, a power station, a water distillation plant, a telephone exchange, ammunition magazines, a vehicle workshop and reservoirs. Fordham's Accommodation, the chambers south of Liddell's Union, was built for around 6,000 men on its own. A small generating station with two generators powered the lot.

The Great North Road is the piece that makes it comprehensible. Roughly a mile long and 60 feet wide, it let military lorries drive the length of the Rock from north to south without surfacing. Digging started after 180 Tunnelling Company formed in 1940, with 170 and 178 joining in 1941. It runs from Maida Vale on Europa Road north to Brigade Headquarters and Doncaster Adit, ending at the abandoned Calpe Hole Generating Station.

What happened next is the detail nobody puts on a poster. The Royal Engineers used the complex into the early 1970s. In 1978 the old Assembly Hall became a disco. In the 1990s part of it opened as the WWII Tunnels.

The room where Operation Torch was run, and the claim to be careful with

The Admiralty Tunnel is about 1,000 m long and was cut for an entirely unromantic reason: hauling stone on a one metre narrow gauge railway from the quarries on the east side to the naval base begun on the west in 1893. During the war a space of roughly 3,000 square metres halfway along it was turned into the Allied command centre.

From there, in November 1942, Eisenhower ran the opening of Operation Torch, the Allied landings in North Africa. He arrived on 5 November and the landings went in on 8 November.

Here is the correction. A great many pages say Eisenhower planned Operation Torch inside the Rock. He did not. His headquarters for the operation was in London, where the planning was done, and Gibraltar was the forward command post he moved to days before the landings. One tourism page dates his presence to 1941, which is simply wrong. The true version is still remarkable: the invasion of North Africa was commanded from a chamber under a limestone hill, with metres of rock in every direction.

That room is not on any tour. Wikipedia's account says it became a secure data storage facility, held first by Vault Technology Services and then Continent 8, with the Government of Gibraltar as owner. That description carries an as of 2013 note, so take the operator as unconfirmed. What is not in doubt is that it is closed to the public.

What you can actually get into in 2026

TunnelStatusHow you see it
Great Siege Tunnels, Upper GalleriesOpenIncluded with the Upper Rock reserve ticket
The Tunnels: Gibraltar's WWII ExperienceOpenUpper Rock reserve ticket
Great North RoadMinistry of DefenceGuided tour by arrangement, about two hours from Maida Vale
Keightley Way and Dudley Ward WayOpen to trafficYou drive through them
Landport TunnelOpenYou walk through it into the old town
Admiralty TunnelClosedSecure data facility, no public access
Lower GalleriesAbandonedNo access

The WWII visitor site has moved on a long way recently, and it is worth knowing before you decide. The Government announced the fully renovated complex open in a release dated 3 February 2025, delivered by Wright Tech Ltd with the Gibraltar National Museum and overseen by the Government Archaeologist. It carries original footage of the tunnels being drilled, genuine artefacts, a section on wartime espionage and a display on the evacuation of Gibraltarians.

Then a release dated 30 September 2025 added two more rooms: the Gunners Gallery, on the guns that defended the Rock and the creation of the Gibraltar Defence Force, and a cinema screening rare Imperial War Museum footage. If you came before 2025 and remember a dim corridor with some signage, that is not what is there now.

More is coming. In an April 2026 release the Ministry for Heritage set out extended displays at the WWII Tunnels alongside the Northern Defences work and the Moorish Castle phases. It also confirms that Landport Tunnel, which more than a million visitors a year walk through to reach the city, is being upgraded. No dates were given for any of it.

Tickets, timing and the honest warning about access

Both walkable tunnel attractions sit inside the Gibraltar Nature Reserve, so you need the reserve ticket: 30.00 GBP for an adult, 22.00 GBP for a child aged 5 to 11. The reserve runs 09:00 to 18:15 in winter with last entry at 17:45, and 09:30 to 19:15 in summer.

Getting up there is the awkward part. The cable car has carried nobody since 18 November 2025 and the Nature Reserve does not expect it back before 2027, so it is a walk of roughly an hour from town or an official taxi tour. Our cable car status guide sets out both.

On accessibility, the Nature Reserve is unusually straight about it. Access is possible for people with limited mobility, but some sections have steep inclines and narrow spaces that may be difficult, and no works can be carried out to improve this because of the heritage value of the site. That is a real constraint rather than a disclaimer, and it will not change.

One more thing about what is not down there. If you are hoping the tunnels are full of bats, they are not. The honest position on that is in our bats and caves piece, and it is a loss story rather than an attraction.

Practical notes

Allow two hours for both tunnel sites with the walking between them, more if you read everything in the new galleries. It is cool inside and often damp underfoot, so bring a layer and shoes with grip even in August. Photography is fine. The galleries are lit but the light is low, so phones will struggle.

Gibraltar is still tunnelling, incidentally. The newest one is the Kingsway, about 350 m of covered road under the eastern end of the runway, which is how cars now avoid the level crossing entirely.

Victory Suites sits on Devils Tower Road at the northern end of the territory, which is the right end for this particular day: Landport Tunnel and the Moorish Castle approach are the near side of town, and the reserve entrances at the Moorish Castle end are the shortest climb from here. We run 100+ apartments in Gibraltar and list across 300+ booking channels.

Every apartment has a full kitchen, which matters on a day that starts early and involves a hill. There is no front desk and check in is self service, so message the team on WhatsApp if you want to know whether the Great North Road tours are running this week, because that one changes and no page publishes it.

Frequently asked questions

How many miles of tunnels are there in Gibraltar?

About 34 miles, or 55 km, according to the Gibraltar Nature Reserve, inside a territory of 6.7 square kilometres. The Ministry for Heritage breaks it down as roughly 7 miles by 1939, about 18 miles more between 1941 and 1943, and a total of about 34 miles by the early 1960s. Tunnelling finally stopped in April 1968.

Does Gibraltar really have more tunnel than road?

Yes, but the popular claim that it has twice as much is not safe. The tunnel figure of about 55 km is well documented. Published road figures range from about 29 km to 49.9 km, and we could not find a current government figure. More tunnel than road holds either way; double does not.

Which Gibraltar tunnels can you visit?

Two on a normal ticket: the Great Siege Tunnels in the Upper Galleries, and The Tunnels: Gibraltar's WWII Experience. Both are inside the Gibraltar Nature Reserve, so they need the reserve ticket at 30.00 GBP for an adult and 22.00 GBP for a child aged 5 to 11. The Great North Road can be seen on a guided tour by arrangement. The Admiralty Tunnel and the Lower Galleries are closed.

Did Eisenhower plan Operation Torch in the Gibraltar tunnels?

He commanded the opening of it from there, but the planning was done in London, where his headquarters was. Eisenhower arrived in Gibraltar on 5 November 1942 and the North Africa landings went in on 8 November. The command centre was a space of about 3,000 square metres inside the Admiralty Tunnel, which is now a secure data facility and closed to the public.

Who dug the Gibraltar tunnels?

The first galleries were cut from 1782 by the Soldier Artificer Company. The wartime network was dug by Royal Engineer tunnelling companies 178, 180 and 170 with a General Construction Company and a Pioneer Company, about 900 men at full strength, plus roughly 300 men of the 1st and 2nd Tunnelling Companies of the Royal Canadian Engineers from 1941. Most of the recruits were former coal miners.

What was inside the Gibraltar tunnels during the war?

A hospital, a bakery, a power station, a water distillation plant, a telephone exchange, ammunition magazines, a vehicle workshop and reservoirs. The Nature Reserve says the complex could house the 16,000 strong garrison with food for 16 months, and the Ministry for Heritage says it was later expanded to take up to 30,000 troops.

Are the Gibraltar tunnels accessible for wheelchairs?

Partly. The Gibraltar Nature Reserve states that access is possible for people with limited mobility, but that some sections have steep inclines and narrow spaces which may prove difficult, and that no works can be carried out to improve this because of the heritage value of the site. Plan on that being permanent rather than temporary.

More Gibraltar guides from Victory Suites